Assign a P6 Baseline to a P6 Schedule
Assign a P6 baseline to a P6 schedule. Assigning a P6 baseline to a P6 schedule allows you to compare baseline data with the current schedule.
To assign a P6 baseline to a P6 schedule, complete the following steps:
Baselines can be reassigned, assigned, added, or deleted by right-clicking on the Primavera project.
After you assign a baseline, you can add the Baseline Project Time Now and Baseline WBS Code columns to the S1 // Projects Activities grid. The Baseline Project Time Now column displays the Time Now date from the assigned baseline project and is useful if, for example, you want to see if activities that are in the baseline but no longer in the project should have been completed. The Baseline WBS Code column displays the WBS code on the baseline activities. These fields are also available to use in metrics and on the S2 // Diagnostics tab, as well as in reports.